Bid Overview.
Real-time view of every active pursuit — Cortex's bottom-up cost basis, top-down comp-anchored benchmark, OWP's submitted bid (where applicable), and win-probability optimum per project. Click any row to drop into the buildup, scope manifest, and win-prob curve.
Every bid OWP has submitted, newest first. Active bids still in the Estimator Studio (analyzing / drafting) only enter this table once they're submitted — that's when they start affecting win-rate tracking. Closed jobs are the ground truth Cortex uses to price the next one; lost bids anchor the win-rate calibration. ✓ Live wire from Supabase projects — unit counts, bid $, GC, owner, competitor, and bid date are all live. Direct-cost and margin columns are empty on lost rows by definition (no actuals to reconcile).
| Year | Project | GC | Round | Outcome | JDR | Cal | Units | Bid $ | $/Unit |
|---|---|---|---|---|---|---|---|---|---|
| Loading bid history… | |||||||||
Bid Calendar.
Every date that matters across the active pipeline — proposal deadlines, walkthroughs, GC response windows, lifecycle decisions. Auto-derived from project metadata milestones and lifecycle outcomes. Updates the moment a new bid is ingested or a lifecycle state changes.
Events are auto-extracted from each bid's project.milestones[] array + lifecycle bid_outcome fields (submitted dates, decision dates, R2 due dates). To add a milestone manually, edit the project metadata JSON and re-sync — it'll appear here on next load. Subscribe to the .ics feed to mirror this calendar into Google Calendar / iCal / Outlook.
Bid Review.
Pre-submit review sheets for every active bid · the one-page artifact you walk through with Rich at the bid-review meeting. Project facts (auto-cited from cover/parser), Cortex bid triangulation (bottom-up vs top-down vs OWP submitted), comp anchors, win-probability call, and recommendations — all on one page. Print it for the meeting. Updates live from Supabase as bids advance.
Review what this bid can add to Atlas
This bid has no eligible new Atlas facts.
$21,860/unit · $2,852/permit-fx
Working in Card 5 ↓ live edits flow here
inflation-honest baseline · forward to Sep 2028 midpoint
| Project | 1200 116th Ave NE |
| GC | Chinn (E25-07) |
| Owner | High Street NW |
| Architect | Weber Thompson |
| Units | 215 |
| Stories | 8 above + 3 below |
| IBC type | Type IIIA wood / IA podium / IA garage |
| WH system | Heat-pump central |
| Permit fixtures | 1,675 |
| Bid set | SD Pricing 11/18/2025 → 100% DD set per ITB |
| LEED target | Gold |
| Bid type | Design-Build |
| Engineer | One Way Plumbing |
| Code | Line item | Qty | Unit $ | Total | Cortex note | Conf. |
|---|
Loading comparable jobs…
🚨 CRITICAL — Submeter system priced at $0. Spec 010000 explicitly requires "transceivers and repeaters." Bluebeam template missing tags. Atom estimate $50–70k.
⚠ HIGH — Bluebeam template references 2017 Fairfield Bear Creek plans. Template hygiene · re-point to current Plans.pdf.
⚠ HIGH — Cast iron stack qty hand-entered, not Bluebeam-counted. $215k scope · markup tag missing.
+ 3 medium findings · 1 confirmed-ok (heat-pump plant, dog wash both priced correctly).